公司介绍s
unang pahina > sentro ng kaso > Pure Water & Ultrapure Water > Taizhou Mining Copper Sulfate Recovery Project | Copper Recovery System

Taizhou Mining Copper Sulfate Recovery Project | Copper Recovery System

detalyadong pagpapakilala

Project Overview

To Be Provided

Product Water Quality Standard

After treatment, the wastewater shall comply with the applicable discharge requirements of GB 8978-88, Integrated Wastewater Discharge Standard at the final discharge outlet.

Parameter (mg/L)CODBODTotal NSS
Raw Feedwater30,00010,0001,5001,000
DTRO System Permeate<60<60<25<5
Removal Rate>99%>99%>98%>99%

Project Capacity

300 m³/h

Treatment Process

Cyanide Destruction System + Copper Sulfate Concentration System


Mga kaugnay na tag:

MGA KAUGNAY NA KASO

Wala pang resulta ng paghahanap!
Follow us:

Copyright © Qingdao Yanhui Environmental Protection Technology Co., Ltd.

Back to top ff17d371f0gzmef9.png

Gumagamit ang website na ito ng cookies upang matiyak na makukuha mo ang pinakamahusay na karanasan sa aming website.

Tanggapin tanggihan